NSP logoHong Kong Natural Science
Press Limited
  • HOME
  • JOURNALS
  • BOOKS
  • ABOUT
  • GUIDE
SUBMITLoginRegister

NSP logoHong Kong Natural Science
Press Limited
  • 00852-30697751
  • routhpub@163.com

Office Locations

7th Floor, Block B, New Mandarin Plaza,
14 Science Museum Road, Tsim Sha Tsui,
Kowloon, Hong Kong

Useful Links

  • Home
  • Journals
  • Books
  • About

Author Services

  • Article Processing Charges
  • Open Access Policy
  • Copyright Transfer Agreement
  • Author Contribution Statement

About

NSP stands for Hong Kong Natural Science Press. Specializing in academic publishing, we operate under an open access (OA) model and are committed to delivering high-quality academic publishing services to researchers worldwide.

Copyright © 2026 NSP unless otherwise stated
  1. Home
  2. >
  3. Journals
  4. >
  5. 全球经济管理论坛
  6. >
  7. Volume 2026 Issue 2
Article|OPEN ACCESS

建筑工程竣工结算审核常见问题与对策

DOWNLOAD PDF

刘

长江勘测规划设计研究有限责任公司

辉

长江勘测规划设计研究有限责任公司

Volume
Volume 2026 Issue 2
Link
/articles/240
DOI
10.65285/QQJJGLLT.V2I2.002
Copyright
Published by NSP.

Abstract

竣工结算审核是把控工程造价、规范甲乙双方款项收付、防范投资超支的关键环节。现阶段建筑工程结算资料、工程量计量、定额套用、签证变更、取费计价等环节普遍存在疏漏与虚报问题,易造成造价虚高、结算扯皮、资金浪费。本文梳理竣工结算审核全过程高频问题,剖析资料残缺、计量失真、签证不实、合同约束薄弱、审核流程粗放等诱因;从资料前置管控、精准工程量复核、规范变更签证审核、严格定额取费、完善审核管控机制多维度制定应对对策。实践证明标准化审核流程可有效核减虚增造价、化解甲乙结算纠纷,保障建设资金合理利用,规范建筑市场造价管理秩序。

Keywords

  • 建筑工程;竣工结算;结算审核;工程量;签证变更;造价管控

Preview

VIEW PDF

References

  1. 范小丽.建筑工程结算审核中的常见问题及对策研究[J].散装水泥,2026(3):221-223.
  2. 徐简乐.建筑工程造价预结算审核的常见问题与解决对策[J].房地产世界,2025(17):110-112.
  3. 翁慧.建筑工程预结算审核常见问题及精准化解决对策[J].建设机械技术与管理,2025,38(4):177-179.
  4. 陈俊森.工程竣工结算审核的常见问题及对策研究[J].中小企业管理与科技,2024(11):100-102.
  5. 卢淑微.工程竣工结算审核的常见问题及对策探析[J].居业,2023(7):164-166.
  6. 袁志军,黄婧,李淑颖,付岩,雒智勇.建设工程竣工结算审核常见问题及对策研究[J].航天工业管 理,2023(4):45-47.
  7. 王芳.工程竣工结算审核的常见问题及对策[J].工程技术研究,2021,6(22):184-185.
全球经济管理论坛
SUBMIT

65

Accesses

72

Downloads

Key Dates

  • Published:2026-07-30 15:11:56

Recommended Articles

    View more >